1.0 OVERVIEW
概况
1.1 The working/project LOCATION is in Lagos, Nigeria at the NNPC Atlas Cove Terminal. The terminal is situated on the western side of the Commodore Channel, opposite the Eko Atlantic land reclamation and development area. Berthing Dolphin 5 is located within the northern half of the New Atlas Cove Jetty and is the most northern of the five berthing dolphins of the berth..
工程地点:该项目位于尼日利亚拉各斯的NNPC阿特拉斯湾码头。码头位于Commodore海峡的西侧,与Eko****点击查看开发区相对。BD5位于新阿特拉斯湾码头的北半部,是5个泊位中最北端的一个。
1.2 Equipment planned to be leased and its duration is shown in APPENDIX1. The quantity/period in the list is a provisional estimate, which shall not be used as the basis for settlement or claim. The settlement shall be based on the work completion sheet and the signed form of the actual equipment usage time record.
执行计划租赁的设备及租赁期限见附件1,清单内的数量/工期为暂估量,不作为结算或索赔的依据,结算时以完工单及设备实际使用时间记录签认表为准。
1.3 The Scope of Work shall include providing INQUIRER with the Equipment it needs and meets the
1.3 Project implementation requirements, and providing sufficient operators/managers (The quantity shall meet the requirements of the minimum safety manning, INQUIRER and its Client at the same time) to ensure the smooth implementation of work orders issued by INQUIRER.
工作范围应包括向询价方提供其需要,且符合项目实施要求的设备,并配备足够的操作手/管理人员(数量应同时满足最低安全人员配备、询价方和其业主的要求), 以保证询价方下达的工作指令顺利执行。
1.4 Parameters for pile to be driven: Pile length 34.5m, thickness 22mm, pile diameter 914mm.
待施打管桩参数:桩长34.5m,壁厚22mm,桩径914mm。
2.0 RESPONSIBILITIES TO BE BORNE BY THE QUOTING PARTY
报价方责任
2.1 QUOTING PARTY shall be responsible for carrying out repairs and maintenance on the equipment.
报价方应负责设备的维修和保养。
2.2 QUOTING PARTY shall constantly update all permits and certificates for the equipment in order to be in compliance with the applicable regulations.
报价方负责持续更新所有设备的许可证和证书,以符合适用规定。
2.3 QUOTING PARTY shall be responsible for provide feeding and accommodation to his employees.
报价方应负责为其员工提供食宿。
2.4 QUOTING PARTY shall be responsible for the mobilization demobilization of Equipment, and the inquiry party will bear the related costs (This fee needs to be clearly stated in the quotation, if such costs are already included in the unit price, please also specify).
报价方应负责设备的进退场,相关花费由询价方承担(该费用须在报价单注明,如单价已包含该费用,也进行备注)。
2.5 QUOTING PARTY shall take full responsible for property losses and casualties caused by equipment or operators provided by QUOTING PARTY.
租赁期内,报价方应对其提供的设备或操作人员造成的财产损失和人员伤亡负全部责任。
2.6 Due to the fuel being supplied by the INQUIRY PARTY during lease period, the QUOTING PARTY shall allow the INQUIRY PARTY to supervise the consumption of fuel and comply with
2.6 the requirements of the INQUIRY PARTY to save corresponding expenses.
由于租赁期间燃料由询价方提供,报价方应允许询价方监督燃料消耗,并遵守询价方的要求,以节省相应的费用。
3.0 OTHERS
其他
3.1 Please submit equipment parameter information, photos, etc. along with the quotation for our feasibility calculation
请在报价的同时报送设备参数及照片以便我方进行可行性计算。
3.2 QUOTING PARTY shall has full capacity and authority and all necessary licences, permits and consents to enter into and to perform a lease Agreement.
报价方应有充分的能力和权力以及所有必要的执照、许可证和同意书来订立和履行租赁合同。
3.3 Quote currency:USD /NGN, We will give priority to NGN quotation
报价货币:美元/奈拉,我方优先考虑奈拉报价
3.4 If the QUOTING PARTY has any questions about this inquiry document, please contact us before quoting
如报价方对此询价文件有任何疑问,请于报价联系我方
3.5 In the event of any dispute or misunderstanding as to the interpretation of the language or terms of this INQUIRY, the English language version shall prevail.
如中、英文互相歧异或抵触时,以英文文本为准。
4.0 APPENXDIX
附件
APPENDIX 1: LIST OF PLANNED EQUIPMENT
1 |
1 | 振动式打桩机 400-500kN 液压 | 21.****点击查看0000 | 台 |